AVANOS STIMULATORS & ACCESSORIES Lead Set, 2ft, Long Lead Sets, Two (2) Sizes (US Only) (Authorized Distributor Sub-Agreement Required – See Manufacturer Details Page) Avanos Medical, Inc. EL-2MTP LEAD SET 2 FT

AVANOS STIMULATORS & ACCESSORIES Lead Set, 2ft, Long Lead Sets, Two (2) Sizes (US Only) (Authorized Distributor Sub-Agreement Required – See Manufacturer Details Page) Avanos Medical, Inc. EL-2MTP
$409.05
AVANOS STIMULATORS & ACCESSORIES Lead Set, 2ft, Long Lead Sets, Two (2) Sizes (US Only) (Authorized Distributor Sub-Agreement Required – See Manufacturer Details Page) Avanos Medical, Inc. EL-2MTP LEAD SET 2 FT
Out of stock
| Weight | 0.03 oz |
|---|---|
| Dimensions | 5.50 × 1.90 × 0.20 in |
| Freight Class | 60 |
| Item Code | HAL EL-2MTP |
| Manufacturer ID | 986 |
| Manufacturer Item Code | EL-2MTP |
| Manufacturer Name | Avanos Medical, Inc. |
| Pkg | ea |
| Product ID | 10037723 |

